Australian Water Balance Model

|

Description

The Australian water balance model (AWBM) was developed in the early 1990s by Walter Boughton and is now one of the most widely used rainfall-runoff models in Australia. Many GoldSim models incorporate AWBM for calculating runoff around mine sites and for other projects that simulate rainfall runoff in a watershed. This version of AWBM is intended to be used as a module within other GoldSim models but also works as a standalone model. The container "AWBM_Calculations" is what needs to be copied and pasted. Please follow these steps to use the model for your project:

  1. Read the documentation here: http://www.sciencedirect.com/science/article/pii/S1364815203002196
  2. Ensure that this standalone version runs without errors and the results of this standalone version are verified against the RRL Toolkit results (see "Model_Validation" container).
  3. Provide inputs for precipitation, potential evapotranspiration, and catchment area.
  4. Ensure that the "K_Step" data matches the time step associated with the recession constants Kb and Ks (typically 1 day).
  5. Add observed runoff time series data if available. Run the model and compare the observed runoff to the calculated runoff (found in "Model_Calibration")

AWBM is a catchment water balance model that calculates runoff from rainfall at daily or hourly time increments. The daily version is used for water yield and water management studies; the hourly version is used for design flood estimation. Please note this GoldSim implementation was built for a daily water yield estimation.

 

Additional Information

Keywords

hydrology, runoff, recession, baseflow, precipitation, routing, australian, arid, surface, flows

Categories

GoldSim Applications, Water Management, Hydrology

Experience Level
Intermediate
Contact

GoldSim Technology Group

 

Making Better Decisions In An Uncertain World